We are going to see the stages of the Architectural 
design process in today's video

2
00:00:04,800 --> 00:00:10,400
in detail. So, let's go into the video

3
00:00:10,500 --> 00:00:15,300


4
00:00:15,400 --> 00:00:20,200


5
00:00:20,300 --> 00:00:28,500
Hello, I am Dameem Ansari, from Ansari Architects. 
We will see about the stages of Architectural 
design

6
00:00:28,600 --> 00:00:33,400
the way how architects involve in the process

7
00:00:33,500 --> 00:00:38,300
along with their scope of work throughout 
the stages

8
00:00:38,400 --> 00:00:43,200
the duration of time they consume to finish 
the project and many more queries

9
00:00:43,300 --> 00:00:48,100
are asked about our clients initially before 
we begin the work

10
00:00:48,200 --> 00:00:53,000
To clarify such, I am doing this video. It 
will also be useful in choosing an architect.

11
00:00:53,100 --> 00:00:57,900
It will also give clarity on what you can 
expect from them and

12
00:00:58,000 --> 00:01:02,800
what they expect from you. I am going to 
share the same in this video.

13
00:01:02,900 --> 00:01:07,700
First, to choose an architect, you can check 
their website, do research

14
00:01:07,800 --> 00:01:12,600
and pick one for you. The most important 
thing

15
00:01:12,700 --> 00:01:29,900
when choosing an architect is to look for 
real experience rather than 3D designs, imaginary 
projects on their website.

16
00:01:30,000 --> 00:01:34,800
Because design 3D layouts and imaginary models 
are very easy

17
00:01:34,900 --> 00:01:39,700
One can easily get inspiration or download 
it from the internet.

18
00:01:39,800 --> 00:01:47,000
But building it, in reality, is very hard 
and moreover not easy in a landscape like 
India.

19
00:01:47,100 --> 00:01:51,900
The architect should put a lot of involvement 
from their side

20
00:01:52,000 --> 00:01:59,200
Then only they can give you the exact results. 
On our website, we upload only finished photos.

21
00:01:59,300 --> 00:02:04,100
So, check whether the architects you choose 
display original finished images

22
00:02:04,200 --> 00:02:09,000
and also, before choosing them,

23
00:02:09,100 --> 00:02:13,900
ask them to show one or two models of houses 
they have designed.

24
00:02:14,000 --> 00:02:18,800
We will show our clients the houses we built

25
00:02:18,900 --> 00:02:23,700
including the features and all. When you 
see those

26
00:02:23,800 --> 00:02:28,600
you will know the level of finishing

27
00:02:28,700 --> 00:02:33,500
and the quality of work, the skilled workmanship 
of the architect you choose

28
00:02:33,600 --> 00:02:38,400
You can also interact with the owner about 
their work

29
00:02:38,500 --> 00:02:43,300
to get authentic feedback.

30
00:02:43,400 --> 00:02:48,200
You will have a initial meeting at the architect's 
office where you can have general conversations

31
00:02:48,300 --> 00:02:53,100
and get to know about their scope of services 
orally.

32
00:02:53,200 --> 00:02:58,000
You can also enquire about their fees,

33
00:02:58,100 --> 00:03:02,900
the work they do and many more. Then

34
00:03:03,000 --> 00:03:07,800
you can get their quotation in writing through 
email

35
00:03:07,900 --> 00:03:12,700
about the services, drawing and all in detail

36
00:03:12,800 --> 00:03:19,800
including information about sight visits 
will be sent to you after the initial meeting

37
00:03:19,900 --> 00:03:24,700
This is the starting point. From your side

38
00:03:24,800 --> 00:03:29,600
you have to pay a retainer payment to confirm 
the project

39
00:03:29,700 --> 00:03:34,500
as a sign of agreement.

40
00:03:34,600 --> 00:03:39,400
It is proof that you have awarded the job 
to the architect.

41
00:03:39,500 --> 00:03:44,300
Only after that we will begin the initial 
work.

42
00:03:44,400 --> 00:03:49,200
That is the first stage of design.

43
00:03:49,300 --> 00:03:54,100
For the architect to begin the design, you 
have to provide a complete set of documents.

44
00:03:54,200 --> 00:03:59,000
including the sale deed, the parent document, 
and the most important of all is

45
00:03:59,100 --> 00:04:06,100
you have to provide the linked documents 
before 1975 according to the CFDA rule.

46
00:04:06,200 --> 00:04:11,000
You have to make that ready.

47
00:04:11,100 --> 00:04:15,900
You should have the patta on the name of 
the person who has applied for house approval

48
00:04:16,000 --> 00:04:20,800
if not start it immediately.

49
00:04:20,900 --> 00:04:25,700
Because it is a tedious and time-consuming 
process. It would take one to two months.

50
00:04:25,800 --> 00:04:30,600
So apply for it prior. Another important 
thing is

51
00:04:30,700 --> 00:04:35,500
that we consider three types of measurement. 
The Patta measurement

52
00:04:35,600 --> 00:04:40,400
actual site measurement, and the measurements 
on your documents

53
00:04:40,500 --> 00:04:45,300
We take only the smallest comparative measurement 
according to the CFDA rule

54
00:04:45,400 --> 00:04:50,200
The Chennai corporation must also give its 
approval. So, we check all the measurements.

55
00:04:50,300 --> 00:04:59,200
As a client, you have to give us the computerized 
site survey drawing

56
00:04:59,300 --> 00:05:04,100
There are teams who perform surveys, we do 
suggest them for you. You can hire them personally.

57
00:05:04,200 --> 00:05:09,000
It would cost you around 5000 to 6000 rupees.

58
00:05:09,100 --> 00:05:13,900
They will send us the complete computerized 
drawing to us

59
00:05:14,000 --> 00:05:18,800
It is a very important starting point as 
the survey drawing

60
00:05:18,900 --> 00:05:23,700
consists all the features including roads, 
trees, existing buildings

61
00:05:23,800 --> 00:05:33,300
levels, details of angles of the site in 
all the views

62
00:05:33,400 --> 00:05:38,200
will be given in the drawing. It will be 
helpful for us to make the plan.

63
00:05:38,300 --> 00:05:43,100
Soil testing is another important thing. 
It has become mandatory now

64
00:05:43,200 --> 00:05:48,000
The government also insists on it. We also 
arrange it for you

65
00:05:48,100 --> 00:05:52,900
Usually, it costs around 20 to 25 thousand 
rupees.

66
00:05:53,000 --> 00:05:57,800
They drill bores on two different places 
to find out the nature of the soil

67
00:05:57,900 --> 00:06:02,700
Once the report has come, our structural 
engineering will plan the foundation design

68
00:06:02,800 --> 00:06:12,100
We will start the design and you have to 
provide us with the client brief

69
00:06:12,200 --> 00:06:17,000
It has a questionnaire for you to fill.

70
00:06:17,100 --> 00:06:21,900
Usually, it consists of questions about your 
lifestyle

71
00:06:22,000 --> 00:06:26,800
your family members

72
00:06:26,900 --> 00:06:31,700
the nature and age of the future house's 
occupants

73
00:06:31,800 --> 00:06:36,600
along with their general preferences will 
be present in the questionnaire.

74
00:06:36,700 --> 00:06:41,500
Based on it, we will need a client brief 
from you

75
00:06:41,600 --> 00:06:46,400
You can give it in the form of write up,

76
00:06:46,500 --> 00:06:51,300
just convey by phone or through an individual 
meeting. We will take note of it

77
00:06:51,400 --> 00:06:56,200
Most clients provide us with detailed write-up 
although it is not mandatory

78
00:06:56,300 --> 00:07:07,200
You can convey it in person also. Based on 
it we will begin with the initial conceptual 
and schematic drawings

79
00:07:07,300 --> 00:07:12,100
We will provide you with a minimum of two 
to three options

80
00:07:12,200 --> 00:07:17,000
on different styles and possibilites.

81
00:07:17,100 --> 00:07:21,900
We will present you with such designs

82
00:07:22,000 --> 00:07:26,800
and you can ask us for further options if 
you didn't like any

83
00:07:26,900 --> 00:07:31,700
or you can finalise one

84
00:07:31,800 --> 00:07:36,600
and fine turning it accordingly.

85
00:07:36,700 --> 00:07:41,500
The process of design confirmation will take 
up to a month

86
00:07:41,600 --> 00:07:51,600
We consider the design to be most essential 
and spend more time on it.

87
00:07:51,700 --> 00:08:02,800
Once the design is confirmed, there shouldn't 
be a change of plans during construction

88
00:08:02,900 --> 00:08:07,700
So, we take more time in perfecting the plan

89
00:08:07,800 --> 00:08:14,300
to avoid changes during the construction 
stage

90
00:08:14,400 --> 00:08:19,200
By ensuring that there won't be waste of 
time and money. You need to remember that.

91
00:08:19,300 --> 00:08:24,100
Until you are satisfied we will show you 
a lot of design options.

92
00:08:24,200 --> 00:08:29,000
That is what we tell our clients.

93
00:08:29,100 --> 00:08:37,800
Once the plan is decided, we will begin the 
work for drawing approval

94
00:08:37,900 --> 00:08:42,700
It could take one to two months. We can get 
in Chennai corporation itself.

95
00:08:42,800 --> 00:08:53,600
We will need the drawings of structural engineer 
to get the approval nowadays

96
00:08:53,700 --> 00:08:58,500
So, we directly send it to the structural 
engineer once it is done.

97
00:08:58,600 --> 00:09:03,400
The structural engineer will be a part of 
the time. And we add their fee to the quoted 
budget

98
00:09:03,500 --> 00:09:11,400
Initially, they will send us the column settings, 
we will then forward them to you.

99
00:09:11,500 --> 00:09:16,300
There might be changes in the plan with respect 
to the column setting

100
00:09:16,400 --> 00:09:24,900
associated with the corrections and possibilities 
said by the engineer. We will discuss it 
with you and finalize

101
00:09:25,000 --> 00:09:31,400
Once the columns are decided, the structural 
engineer begins with the foundation design

102
00:09:31,500 --> 00:09:36,300
These are the drawing done for approval purpose

103
00:09:36,400 --> 00:09:41,200
Then we will give it to the approval team

104
00:09:41,300 --> 00:09:49,700
who gets further approval from the CMDA, 
corporation, etc. They are specialized in 
it

105
00:09:49,800 --> 00:09:58,100
They will make a specific drawing to submit 
online. We will give that to you too

106
00:09:58,200 --> 00:10:03,000
Once you give us the approval we proceed 
by applying online

107
00:10:03,100 --> 00:10:07,900
The fee will be paid and they will apply 
for getting the approval

108
00:10:08,000 --> 00:10:16,200
In the meantime we begin the next stage of 
work

109
00:10:16,300 --> 00:10:21,100
We do 3D view, the exterior of the building

110
00:10:21,200 --> 00:10:33,300
This is a very important stage. Sometimes 
it would take more time or would be done 
faster as it is a creative process.

111
00:10:33,400 --> 00:10:38,200
We would give you atleast two or three final 
options

112
00:10:38,300 --> 00:10:46,400
You can choose any of them. Then we will 
fine-tune it and take it to the next level.

113
00:10:46,500 --> 00:10:51,300
All these processes will take another one 
month and in the due time

114
00:10:51,400 --> 00:10:56,200
we would also get the approval. So the time 
will be well utilized.

115
00:10:56,300 --> 00:11:01,100
We will proceed to the further drawing only 
after finalizing the 3D elevation

116
00:11:01,200 --> 00:11:06,000
By this time we will be proceeding to the 
next stage of detailed drawings

117
00:11:06,100 --> 00:11:10,900
We will do a minimum of hundred drawings 
for a single house

118
00:11:11,000 --> 00:11:15,800
We will provide you this list of drawings 
in the scope of work

119
00:11:15,900 --> 00:11:20,700
Doing all the hundred drawings at a time 
is almost impossible

120
00:11:20,800 --> 00:11:25,600
so we do it in the stage of construction.

121
00:11:25,700 --> 00:11:35,400
We will give the important drawings to the 
contract team to get you the estimated quotation 
and begin the construction.

122
00:11:35,500 --> 00:11:40,300
For that purpose, we will complete the essential 
drawings soon. It will have the foundation 
plan, window size

123
00:11:40,400 --> 00:11:50,000
types of finishes, window models, flooring, 
type of toilet fitting and all will be finalized 
with your assistance

124
00:11:50,100 --> 00:11:54,900
Then we will give it to the construction 
team. They will give you a quote

125
00:11:55,000 --> 00:11:59,800
After you approve this quote. We will begin 
the work by choosing a construction team

126
00:11:59,900 --> 00:12:04,700
and award the contract. Another important 
thing with the approval is

127
00:12:04,800 --> 00:12:09,600
demolishing come recontruction is what you 
should get.

128
00:12:09,700 --> 00:12:14,500
If you get it separately, you have to undergo 
added expenses.

129
00:12:14,600 --> 00:12:19,400
So, during the application, you need to get 
it both to make the task easier.

130
00:12:19,500 --> 00:12:24,300
The expense will also be reduced.

131
00:12:24,400 --> 00:12:29,200
If you have the need for demolition, we also 
help you with demolition contractors.

132
00:12:29,300 --> 00:12:34,100
Usually, we will call them to look at the 
property

133
00:12:34,200 --> 00:12:39,000
then they will give you a separate quotation 
for it

134
00:12:39,100 --> 00:12:45,100
According to the property, the amount would 
be from 50 thousand to 1 Lakh

135
00:12:45,200 --> 00:12:50,000
We would fix that and help with demolition 
also

136
00:12:50,100 --> 00:12:54,900
After finalizing the construction team, we 
would have an initial meeting with them.

137
00:12:55,000 --> 00:12:59,800
We would explain the features and expectation 
of this project to them

138
00:12:59,900 --> 00:13:11,200
We would supply them with initial drawings 
like foundation and centerline drawing to 
begin the construction

139
00:13:11,300 --> 00:13:16,100
They begin with making the centerline marking 
on the site

140
00:13:16,200 --> 00:13:21,000
Our engineer will visit the site to check 
the exactness

141
00:13:21,100 --> 00:13:31,100
We ask for variation drawing also.

142
00:13:31,200 --> 00:13:36,000
Once we receive it, we give further suggestions 
regarding the same

143
00:13:36,100 --> 00:13:40,900
Again our engineer will check it.

144
00:13:41,000 --> 00:13:51,200
To begin with the foundation, they imply 
the PCC and then fix the column rods

145
00:13:51,300 --> 00:13:56,100
Only when our engineer approves, they will 
start concreting the columns.

146
00:13:56,200 --> 00:14:01,000
It is one of the most important things that 
we follow.

147
00:14:01,100 --> 00:14:05,900
Each and column and the rod is certified 
by our engineer

148
00:14:06,000 --> 00:14:10,800
only then they will begin the concreting.

149
00:14:10,900 --> 00:14:20,800
The foundation process itself will take one 
to two months. Then they will begin with 
the ground floor roof stage

150
00:14:20,900 --> 00:14:25,700
During this time, we would think about the 
interior design

151
00:14:25,800 --> 00:14:37,600
Usually, architectural design and interior 
design are two different scopes of services

152
00:14:37,700 --> 00:14:42,500
Most of the time we will show you with the 
interior designs

153
00:14:42,600 --> 00:14:47,400
Then only you will get a complete look with 
the interior design, landscape design

154
00:14:47,500 --> 00:14:59,600
with everything. Landscape design will come 
with our work, so we will do it for you. 
But interior design is different

155
00:14:59,700 --> 00:15:04,500
Once the quote for interior design is agreed 
upon. We will start with the work

156
00:15:04,600 --> 00:15:09,400
When the foundation process gets over we 
will begin with the interior design process.

157
00:15:09,500 --> 00:15:18,500
Once we make the interior design you will 
get a complete walkthrough model of the house

158
00:15:18,600 --> 00:15:23,400
We will show each and every room model in 
3D

159
00:15:23,500 --> 00:15:28,300
We will provide three or four views, with 
different styles and colour options

160
00:15:28,400 --> 00:15:33,200
It is a major work and will require a minimum 
of three months

161
00:15:33,300 --> 00:15:38,100
So, we will begin with the foundation stage. 
Sometimes it may also take four months

162
00:15:38,200 --> 00:15:43,000
There will be more fine-tuning as it is a 
major subject

163
00:15:43,100 --> 00:15:47,900
There will be more involvement from your 
side also

164
00:15:48,000 --> 00:15:52,800
It will be more easy for us to fix the electrical 
points also

165
00:15:52,900 --> 00:15:57,700
so we begin with the foundation stage itself

166
00:15:57,800 --> 00:16:02,600
Then we give the roof stage drawings to the 
contracting team.

167
00:16:02,700 --> 00:16:07,500
It will have the features and details of 
the roof

168
00:16:07,600 --> 00:16:12,400
and structural drawings which have the beam 
size and slab size

169
00:16:12,500 --> 00:16:17,300
will also be given to the construction team. 
They will take nearly one and a half month

170
00:16:17,400 --> 00:16:22,200
to finish one roof.

171
00:16:22,300 --> 00:16:27,100
The concrete shuttering also must not be 
removed quickly.

172
00:16:27,200 --> 00:16:32,000
We insist them to keep it in place for 21 
days

173
00:16:32,100 --> 00:16:36,900
So, we have to take the proper time to construct 
a house and not hurry

174
00:16:37,000 --> 00:16:41,800
Usually, they ask us how long it will take 
to construct a house

175
00:16:41,900 --> 00:16:49,400
15 months is the minimum time. Usually, the 
constraint is 18 months.

176
00:16:49,500 --> 00:16:54,300
We need to remember that and work. Then only 
you will get a good finish and quality.

177
00:16:54,400 --> 00:16:59,200
In this stage, you have to finalize three 
important things

178
00:16:59,300 --> 00:17:04,100
They are window types like UPVC

179
00:17:04,200 --> 00:17:09,000
Aluminium and lot of quality in UPVC

180
00:17:09,100 --> 00:17:13,900
You have to decide the material of the windows

181
00:17:14,000 --> 00:17:18,800
We will also give you a lot of suggestions. 
Most people use a combination of wood

182
00:17:18,900 --> 00:17:23,700
and aluminium or UPVC for large openings

183
00:17:23,800 --> 00:17:28,600
Traditional type of wooden windows are also 
popular

184
00:17:28,700 --> 00:17:33,500
You can decide that. Then you need to decide 
on wooden frames

185
00:17:33,600 --> 00:17:38,400
We will finalize this and give it to the 
contractor. We will also ask you to choose 
the flooring

186
00:17:38,500 --> 00:17:43,300
We assist you with it by coming to marble 
shops

187
00:17:43,400 --> 00:17:48,200
Next we move to sanitary ware.

188
00:17:48,300 --> 00:17:53,100
We will guide you with toilet fittings and 
toilet tiles

189
00:17:53,200 --> 00:17:58,000
We also assist you in the process

190
00:17:58,100 --> 00:18:02,900
We have to finish these process at the earliest

191
00:18:03,000 --> 00:18:07,800
then it will be easy for contracting to move 
fast.

192
00:18:07,900 --> 00:18:12,700
You have to choose sanitary ware and flooring 
as soon as they finish the ground floor roof

193
00:18:12,800 --> 00:18:17,600
It will be better for the team to finish 
the work fast

194
00:18:17,700 --> 00:18:25,300
After the interior design, the team will 
quote you separately

195
00:18:25,400 --> 00:18:30,200
regarding each item. Once you agree

196
00:18:30,300 --> 00:18:35,100
they begin with the interior work as soon 
as the flooring is finished

197
00:18:35,200 --> 00:18:45,000
Once the flooring is over, it is the right 
time to begin with the interior work

198
00:18:45,100 --> 00:18:55,200
It would take eight to nine months from here. 
Soon we will begin soon once the flooring 
is over

199
00:18:55,300 --> 00:19:00,100
So, we keep the flooring stage as a very 
important one

200
00:19:00,200 --> 00:19:08,700
So, we protect the flooring using the POP 
and then begin with the false ceiling work

201
00:19:08,800 --> 00:19:13,600
That is the starting of the interior work

202
00:19:13,700 --> 00:19:20,800
It would take up to 6 months even though 
we make it quick

203
00:19:20,900 --> 00:19:30,700
We cannot hurry the process, because at a 
time there will be 20 to 25 or 50 people 
working with the interior as well as civil 
team

204
00:19:30,800 --> 00:19:35,600
We cannot accommodate more people in a single 
house also

205
00:19:35,700 --> 00:19:40,500
We won't get the finish we desire. As I said 
18 months is the maximum time

206
00:19:40,600 --> 00:19:45,400
Not only interior work will happen during 
this stage

207
00:19:45,500 --> 00:19:54,400
we also work with sanitary ware, electrical 
work, tiles and many more

208
00:19:54,500 --> 00:19:59,300
Civil work and interior work will be happening 
side by side

209
00:19:59,400 --> 00:20:08,000
So, for it to get over we will need 15 to 
18 months

210
00:20:08,100 --> 00:20:12,900
you can expect the finishing by that time.

211
00:20:13,000 --> 00:20:17,800
Our drawings will be there till the end of 
the project. An architect's responsibility 
is not just making drawings alone

212
00:20:17,900 --> 00:20:22,700
We provide support till the stage you occupy 
the house

213
00:20:22,800 --> 00:20:27,600
During the ending stage you will get the 
compound wall, gate designs

214
00:20:27,700 --> 00:20:40,900
pavement designs, landscaping designs, and 
everything will involve the architect's assistance.

215
00:20:41,000 --> 00:20:45,800
We even give you the terrace tile and landscape 
design

216
00:20:45,900 --> 00:20:50,700
We can do a mild dry landscape. We will also 
provide you the details

217
00:20:50,800 --> 00:20:55,600
The elevation designs and ideas on how it 
can be done

218
00:20:55,700 --> 00:21:00,500
we will also guide the contracting teams 
accordingly.

219
00:21:00,600 --> 00:21:05,400
These will happen during the final stages 
of construction. We will decide the material 
for elevation also

220
00:21:05,500 --> 00:21:10,300
In our experience, we pick out the long-standing 
material

221
00:21:10,400 --> 00:21:19,200
You need to understand that the involvement 
of the architect will be there till the end 
process.

222
00:21:19,300 --> 00:21:24,100
You can also insist on it. As soon as the 
contracting team comes into the picture,

223
00:21:24,200 --> 00:21:29,000
we will create a WhatsApp group. There will 
also be another WhatsApp group in the initial 
stage

224
00:21:29,100 --> 00:21:38,400
The co-ordinators, the team members and clients 
will be a part of that WhatsApp group

225
00:21:38,500 --> 00:21:47,700
Every changes and conversations will take 
place in that group only

226
00:21:47,800 --> 00:21:55,300
It would be much easier to coordinate. Once 
construction takes place, we will add the 
contracting team, supervisors, and their 
team head.

227
00:21:55,400 --> 00:22:03,200
The main thing we insist is that they should 
provide every day update in the WhatsApp 
group

228
00:22:03,300 --> 00:22:08,100
including photographs. There are more advantages 
to it.

229
00:22:08,200 --> 00:22:16,200
The client will know the update and the drawing 
team will know what is required.

230
00:22:16,300 --> 00:22:21,100
The quality of the work and the mistakes 
can also be seen in the photos

231
00:22:21,200 --> 00:22:30,100
It is better to identify prior. So for better 
coordination, we use WhatsApp groups.

232
00:22:30,200 --> 00:22:40,300
Like this, we closely coordinate the architectural 
design process. Then only we can get the 
results as shown on our website

233
00:22:40,400 --> 00:22:46,400
So, coordination is very important. That 
is all about the stages of the design process

234
00:22:46,500 --> 00:22:51,300
Following this only, we construct high end 
luxury homes in India

235
00:22:51,400 --> 00:22:56,200
Thanks for watching this video
