Hi! This is going to be a quick status update 
video on the CLK.

2
00:00:37,900 --> 00:00:44,700
We put a lot of effort into building this 
car, but the progress isn't very visible.

3
00:00:44,800 --> 00:00:53,800
We spent about a month worth of work on it 
but all you're gonna see is that the engine 
is now installed,

4
00:00:53,900 --> 00:00:57,400
And the suspension is pretty much how it 
was before and so on.

5
00:00:57,500 --> 00:01:04,500
So I'm going to demonstrate what we've done 
so far and what the next steps are going 
to be.

6
00:01:04,800 --> 00:01:08,700
First of all we installed the engine. It 
was not a big deal,

7
00:01:08,800 --> 00:01:13,000
Because it fit snug into its place with stock 
engine mounts.

8
00:01:13,100 --> 00:01:17,700
This has been the easiest task that we've 
done on the car so far.

9
00:01:18,800 --> 00:01:26,600
I said in the previous video that it was 
wired for a DTA ECU, which we'll convert 
to MaxxECU,

10
00:01:26,700 --> 00:01:32,200
But we hope that we can use the existing 
loom and just have to change some connectors 
and such.

11
00:01:32,500 --> 00:01:38,200
This job is going to get done by Hubdyno 
for us, so we won't touch the cabling.

12
00:01:39,200 --> 00:01:45,700
We still have to finish some mechanical parts, 
at the moment the oil cooler is bypassed 
too,

13
00:01:45,800 --> 00:01:53,300
The fuel system and nothing else is hooked 
up at the moment. We will quickly finish 
up these things before sending the car out 
to get the loom made.

14
00:01:53,400 --> 00:01:59,500
After that we will be ready for the first 
startup and we'll hear what engine sounds 
without headers.

15
00:01:59,900 --> 00:02:03,600
Let's take a look at a carVertical report 
of an SL Merc that was involved in an accident.

16
00:02:03,700 --> 00:02:14,000
It was first registered in 2002 in the USA, 
and then after lots of usage it got imported 
into Hungary in 2022, so 20 years later.

17
00:02:14,300 --> 00:02:21,000
Probably already in a damaged state. It has 
69k kms in it, so it wasn't used a lot.

18
00:02:21,100 --> 00:02:25,500
And here it says it got damaged in 2021 back 
in the US.

19
00:02:26,600 --> 00:02:30,700
Let's take a look at the photos, but before 
that the price! It was imported for $14,000,

20
00:02:31,200 --> 00:02:36,700
And for the last time it was listed for 13,000€ 
in  Hungary. They didn't make a lot of money 
on the car.

21
00:02:37,400 --> 00:02:39,600
A good little V8 SL500.

22
00:02:41,000 --> 00:02:47,000
Here are the pictures from America, where 
we can see that the rear left of the car 
was damaged.

23
00:02:47,800 --> 00:02:50,100
Nothing else really, no airbag got deployed 
as far as I can see.

24
00:02:50,400 --> 00:02:59,800
And finally from 06.2022, here are pictures 
with Hungarian dealer plates, the car is 
in immaculate condition.

25
00:03:00,900 --> 00:03:04,400
And then another group of photos and that's 
all.

26
00:03:04,600 --> 00:03:10,000
If you want to check out your car, use the 
link in the description to get a 20% discount.

27
00:03:11,200 --> 00:03:14,100
And then what we invested the most work into 
is the suspension,

28
00:03:14,600 --> 00:03:25,500
Because when I originally presented this 
car, the front struts were just temporarily 
put in place as mockups with no final solution.

29
00:03:25,800 --> 00:03:36,400
Since then we completely redesigned the front 
strut towers, because this suspension is 
made for the W204 C63 AMG and the two chassis 
are not compatible.

30
00:03:36,600 --> 00:03:49,600
We had to drill new holes on the tower and 
we came up with a hybrid solution to mate 
the tower of a W204 with this car.

31
00:03:49,800 --> 00:03:53,800
There was some welding involved and some 
fabrication.

32
00:03:53,900 --> 00:04:00,700
This is ready and done, the first suspension 
is completed mechanically,

33
00:04:00,800 --> 00:04:06,200
We still have some wiring to do and to finish 
the hydraulic part for the HLS to work.

34
00:04:07,000 --> 00:04:11,200
But this part is going well. The first brakes 
are also properly installed,

35
00:04:11,300 --> 00:04:18,200
Previously it was temporarily installed, 
but now it is all measured up and big brakes 
are properly installed.

36
00:04:18,400 --> 00:04:26,100
This was the biggest progress we've made. 
The same applies for the rear as well, the 
rear suspension is mounted in place too.

37
00:04:26,500 --> 00:04:39,700
There we had to do similar changes as in 
the front. We had to fabricate a top plate 
for the rear strut as it was completely incompatible 
with the W204 parts.

38
00:04:40,500 --> 00:04:51,000
We've done that, welded in a plate that matches 
with the strut. The springs fitted easily, 
there was no hassle with that.

39
00:04:52,300 --> 00:04:58,600
The suspension was a huge step for us, since 
we had to do everything custom,

40
00:04:58,900 --> 00:05:09,600
And it takes a lot of them to think about 
it and to try different solutions, they might 
not work, then we we have one that works, 
put that into reality.

41
00:05:10,000 --> 00:05:12,800
We are very happy to be past this part now.

42
00:05:13,800 --> 00:05:17,400
Then we started mounting the gearbox into 
the car,

43
00:05:18,000 --> 00:05:21,100
I will lift the car now and show you how 
that looks!

44
00:05:28,200 --> 00:05:31,300
Our transmission is a 5 speed Samsonas sequential 
gearbox,

45
00:05:32,500 --> 00:05:39,800
It is just mounted there to see if it clears 
the transmission tunnel and to see the mounting 
points.

46
00:05:39,900 --> 00:05:42,900
It seems that everything is fine, we won't 
have many problems with it.

47
00:05:43,100 --> 00:05:48,900
We also started fabricating the gearbox mounting 
console, this is still only halfway done.

48
00:05:49,000 --> 00:05:57,900
When we're done with it, then we'll continue 
with the linkage and the spot for the shifter 
which will come up right here.

49
00:05:59,700 --> 00:06:03,300
So this part is pretty much it,

50
00:06:03,400 --> 00:06:08,200
We paired it up to our bellhouse,
