1
00:00:28,200 --> 00:00:37,500
And in our program 360, it can be found, 
in this opportunity, one of the macro building 
sites that is being done thanks to the China-Venezuela 
agreement.

2
00:00:37,600 --> 00:00:44,200
We refer to the baseball stadium as the park 
of Hugo Chavez, which is going to be one 
of the biggest in Latin America.

3
00:00:44,300 --> 00:00:53,200
But, in order to know in detail of what this 
building site we are accompanied, at this 
starting hour of the portfolio of public 
works, Admiral Salazar Coll, welcome minister.

4
00:00:53,300 --> 00:01:07,600
Well, many thanks Boris, here I send my regards 
to the Venezuelan people and, as always, 
through those screens inform the Venezuelan 
people of this grand macro building site 
that only the Bolivarian Revolution dares 
to build,

5
00:01:07,700 --> 00:01:17,200
searching for the wellbeing and all the places 
of entertainment that don’t always come to 
contribute with sport, but also with tourism 
for the entertainment of the people.

6
00:01:17,300 --> 00:01:23,300
Here we are in the park Hugo Chavez, this 
is the baseball stadium, one of the installations 
that will come to conform this park,

7
00:01:23,400 --> 00:01:35,200
and this park began with a huge soil movement, 
there were 3 million cubic meters of dirt 
that were moved here, because if we see this, 
it was a total hill.

8
00:01:35,300 --> 00:01:50,600
And so, to find the space, it had to be profiled, 
but beyond that also began, once the movement 
of the soil began, with the slope stabilization 
and the construction of all the superficial 
drainage systems.

9
00:01:50,700 --> 00:02:03,800
Here we have screens strapped, we have terrace 
systems as well, and furthermore we have 
a protection system with geotextil nets.

10
00:02:03,900 --> 00:02:12,700
Notably, and importantly to point out, that 
the superficial drainage systems are going 
to be connected to a rainwater recollection 
tank,

11
00:02:19,000 --> 00:02:26,000
which is going to serve and it is going to 
feed the irrigation system of the grass, 
which is natural, of the baseball park Hugo 
Chavez Frias.

12
00:02:26,100 --> 00:02:30,900
Minister, let’s try to illustrate to our 
audience that maybe has heard a lot about 
this stadium,

13
00:02:31,000 --> 00:02:35,800
but perhaps has neither been able to perceive 
its general characteristics

14
00:02:35,900 --> 00:02:40,700
beyond the theme of how the irrigation system 
is being implemented. Let’s go more general:

15
00:02:40,800 --> 00:02:45,600
What is the surface of the stadium?  How 
many people will be able to enjoy it?

16
00:02:45,700 --> 00:02:50,500
And beyond it all, why is it important? -Well, 
yes, about the importance, I already said 
it.

17
00:02:50,600 --> 00:02:55,400
It comes to mark a myth a stadium like this 
in Latin America,

18
00:02:55,500 --> 00:03:00,300
internal boulevards with 34,911 spectators 
that when sitting in their places are going 
to be there in booth style seats,

19
00:03:00,400 --> 00:03:05,200
but we can come to a maximum of 40,000 people

20
00:03:05,300 --> 00:03:10,100
as well because we have some internal boulevards, 
and one in the center field, and

21
00:03:10,200 --> 00:03:15,000
beyond that, between the hallways and between 
the steps as well there is

22
00:03:15,100 --> 00:03:19,900
enough spreading with respect to that as 
well. This park within

23
00:03:20,000 --> 00:03:24,800
the frame of building sites, and speaking 
in the sense of civil engineering, had

24
00:03:24,900 --> 00:03:29,700
a perfectly consolidated ground, and for 
such,

25
00:03:29,800 --> 00:03:34,600
thus the majority of its direct foundations 
except for a

26
00:03:34,700 --> 00:03:39,500
small sector that is piloting there, there 
were

27
00:03:39,600 --> 00:03:44,400
6,000 tons of steel and 70,000 cubic meters 
of concrete!

